Project Properties
The Project Properties panel collects per‑project settings — naming and coordinate system, how and when the project is saved, mesh storage, the map panel, interaction preferences, and the 3D renderer.
Open it by selecting the project at the top of the project tree (its settings appear in the Properties pane). Settings are grouped into collapsible categories; expand a category to see its options. Hover any row for a tooltip.
Most settings are saved with the project. A few are application‑wide (saved per user): Verbose Debugging, Use Vulkan Renderer and Release Hidden Models On Low Memory.
General
| Setting | What it does |
|---|---|
| Name | The display name of this project. |
| EPSG Code | The project's coordinate reference system (the EPSG projection code). Determines how coordinates are interpreted and reprojected. See Setting the coordinate system. |
| Cesium Vertical Offset | Vertical shift applied to streamed Cesium and Google 3D Tiles terrain, in project units. Use it to line streamed terrain up with local survey data when the vertical datum leaves a residual offset. It takes effect at once, does not download tiles again, and moves where tiles are drawn and picked, not the project extent. |
| Vertical Datum Transforms | Turn the vertical datum correction below on or off. |
| Vertical Datum | The geoid model used to convert between ellipsoidal heights (what GPS and the ellipsoid give you) and orthometric heights (height above mean sea level) — None, EGM2008 (EPSG:3855), EGM96 (EPSG:5773), or ODN - Newlyn (EPSG:5701). |
Vertical datum and orthometric height
Heights in a project are ellipsoidal unless you set a vertical datum: measured from the reference ellipsoid, not from sea level. The two differ by the geoid separation, which is around 45–55 m across the UK and varies globally — so this matters whenever a height has to agree with a map, a survey, or a levelling datum.
Setting a Vertical Datum and enabling Vertical Datum Transforms makes VRGS convert heights through a geoid model:
| Option | Use it for |
|---|---|
EGM2008 (EPSG:3855) | Global orthometric heights. The usual choice outside a national datum. |
EGM96 (EPSG:5773) | Global, older and coarser. Choose it when matching data already referenced to EGM96. |
ODN - Newlyn (EPSG:5701) | United Kingdom. Ordnance Datum Newlyn — the datum Ordnance Survey heights and UK levelling are quoted against. Pair it with British National Grid (EPSG:27700). |
The conversion needs a geoid grid file, which VRGS downloads from cdn.proj.org the first time it is required and then caches locally. See Online & Connectivity for the access this needs.
If the geoid grid cannot be found or downloaded, the transform is still built but performs no vertical correction — heights pass through as ellipsoidal while the project still reports the datum as set. There is no on-screen warning. If orthometric heights look wrong by roughly the geoid separation for your area (tens of metres), check that VRGS was able to reach cdn.proj.org at least once, then reopen the project.
A vertical datum changes heights, not horizontal position. Choosing ODN does not by itself put your data on British National Grid — set the EPSG Code to 27700 for that.
Saving & Backup
| Setting | What it does |
|---|---|
| Enable Auto Save | Automatically save the project at the Autosave interval. Off by default. An autosave is skipped while background work runs, and does not convert older data files. |
| Autosave interval | Time between automatic saves, in minutes. 10 by default. A value outside 1 to 120 is brought back into that range when the project is next opened. |
| Save After SfM Stage | Save the project as a photogrammetry run starts and as each of its stages finishes, so a run of many hours cannot be lost if VRGS exits before you save. On by default. The interval autosave cannot do this, because it skips while background work runs. |
| Backup On Save | Keep a backup zip of the project file and the database each time you save. On by default. Model files are not in the zip; see Managing backups. |
| Backup Interval | How often a backup copy is retained when Backup On Save is enabled — Always, Hourly, Daily, Weekly, Monthly, Yearly or Never. Daily by default. |
| Vacuum On Next Reload | Compact the project database the next time the project loads — removes deleted items and reclaims disk space. The flag clears itself after it runs. |
On large projects, leave Backup Interval at Daily (or longer) so saves stay fast, and run Vacuum On Next Reload occasionally to keep the database compact after lots of edits/deletions.
Saving and Recovering a Project covers what a save does and what VRGS asks when a project opens or closes.
Meshes & Performance
| Setting | What it does |
|---|---|
| Compressed Meshes | New meshes are always written in the current compressed format, whichever way this is set, and opening a project offers to convert older ones. Off by default. Upgrade Format on a mesh's menu does nothing unless this is ticked. |
| Optimise For Speed | Optimise meshes for fast loading and editing rather than smallest size. Turn off if you'd rather minimise on‑disk size. |
| Release Hidden Models On Low Memory | When free memory runs low, give back the memory of meshes and point clouds that have been hidden for a while; showing one reads it back from its file. Models with unsaved edits are kept. On by default. A setting for this computer, not the project. See Memory. |
| Release Models Hidden For (seconds) | How long a model must have been hidden before it may be released, 5 to 86400 seconds. 600 (ten minutes) by default, so switching layers on and off while you work does not cost a reload. |
| Treat Memory As Low | Release every model hidden longer than the time above, however much memory is free, instead of waiting for memory to run low. Keeps memory use down, at the cost of reading models back when they are shown. Off by default. |
| Keep Interpretations On Their Models | Polylines, orientations, geological logs and other interpretations stay attached to the mesh, point cloud or tiled model they were made on, and move with it when it is moved. Switching it on in an older project attaches the existing interpretations in the background, which can take a while on a large project. On by default for new projects. |
Map Panel
| Setting | What it does |
|---|---|
| Default URL | Map service used by the 2D map panel — Bing Maps, Google Maps or Google Earth. |
| Map Default Zoom | Default zoom level for the map panel (1–20). |
Startup & Interaction
| Setting | What it does |
|---|---|
| Reload last scene | Reopen the scene that was active when the project was last closed. |
| Reverse mouse wheel | Reverse the direction the mouse wheel moves the model. |
Advanced & Diagnostics
| Setting | What it does |
|---|---|
| Use Vulkan Renderer | Render the 3D view with Vulkan instead of OpenGL. Vulkan is the default from 3.4 and is required for VR; clear this box only to fall back to OpenGL for a comparison. Takes effect after restarting VRGS — toggling it does not switch the view you are looking at. |
| Verbose Debugging | Write detailed diagnostic messages to the log. Useful for troubleshooting; may slow the application. |
| Python Path | Folder containing the Python 3.13 runtime used for scripting and the machine‑learning tools. |
Changing the renderer takes effect the next time VRGS starts — it does not switch the live 3D view. You can also set it from the command line with -vulkan or -opengl; see the VR User Guide.
Stratigraphy
The age window the stratigraphic column opens at.
| Setting | What it does |
|---|---|
| Set Age Range | Open the column at the range below instead of working it out from whatever stratigraphy the visible model carries. |
| Top Age (Ma) | The younger end of the range, in millions of years before present. |
| Base Age (Ma) | The older end. |
A Book Cliffs project is Top 66, Base 100.5. The mouse wheel over the column can still take you outside the range you set; switching the column off clears the zoom and returns it to this range.
GNSS Data
Shown only while a GPS/GNSS receiver is connected — live, read‑only telemetry with nothing to edit.
| Row | What it shows |
|---|---|
| Solution | The current fix quality — GPS, DGPS, RTK float or RTK fixed. |
| Satellites used | Satellites contributing to the fix, out of those visible. |
| RTK corrections | The NTRIP correction stream's state, when one is configured. |
| (per satellite) | Each tracked satellite by constellation and PRN, with its azimuth, elevation and signal‑to‑noise ratio, marked (in fix) where it contributes. |
Stress Field
The stress field is no longer set here. The project's in-situ stress states are listed under Collections > Stress Tensors, where a project can hold several and choose which one the geomechanics tools use. A project from an earlier version keeps its stress field there as the tensor Regional Stress. See Stress Tensors.